Last Installation of the Year!With freeze change well under way for most of our clients this straight forward Juniper MX960 fresh install in to a non live rack is possibly the last installation we shall be doing this year. Collected from our client's office in London and racked up in Equinix LD4 Slough. We stripped the chassis down and temporarily housed the line cards in our anti static lined flight case rack whilst installing it with our chassis lift and slide system (CLASS™) Want to see more of the services we provide in the IT industry then visit our website page via the unique URL www.relocate-IT.co.uk
0 Comments
December 2016 an SOS was put out by one of our clients late Friday night to courier some urgent equipment out to the P&O Oriana which was undergoing a refit in dry dock Hamburg, Germany. Apparently a major overnight carrier had failed to deliver and the Oriana was due on sea trials on the Monday. With no other option we drove the 600 miles from Heathrow to Hamburg, successfully delivering the equipment by Saturday afternoon. Over 21 years of UK & European transport has taken us to some very interesting places, and sights that not everyone gets to see.
The equipment was de racked using our range of bespoke manual handling and lifting equipment and packed securely using anti static foam in our custom range of flight cases. Once at the next site the equipment was unpacked and re racked. All our work is insured. We have an "engineers installation policy" to cover us whilst on site for the physical de / re rack and a bespoke "marine cargo policy" to fully insure the goods whilst in transit. If you would like to learn more about the services we provide please browse our website using the menu above or call us directly on 07734 247 365 We'll Do You Proud Too |
Categories
All
Archives
April 2020
|