The Pre-Staging and Rack Test Checklist covers everything that should happen to IT hardware between delivery from the manufacturer and dispatch to site: receipt, audit, inspection, testing, documentation and packing.
It is written for infrastructure teams, deployment leads and project managers running server relocations, data centre builds, office IT rollouts and multi-site deployments, where a fault found on site costs far more than one found on the bench.
The checklist has eleven sections, each with tick boxes and space for notes: goods in and asset receipt, asset audit and identification, physical inspection, rack and stack preparation, power and boot testing, configuration and firmware readiness, cabling and connectivity, burn-in and stability testing, documentation and reporting, packing for dispatch, and dispatch readiness. A three-part sign-off closes the document: the person who completed the work, the supervisor who checked it, and the client where approval is required.
The aim is simple. Equipment should arrive on site already counted, labelled, tested and packed in the order it will be installed, with a record that matches the asset register line by line.
Use the checklist in your own staging area, or as the acceptance standard for a supplier. Our pre-staging facility works through it before any rack or device leaves for site.
Tell us what's moving, where to and when, and we'll come back with questions or a quote.
We have your details. Someone from the team will read it and come back to you by phone or email.
That did not send. Please try again, or call +44(0) 1932 247 365.
We have your details. Someone from the team will read it and come back to you by phone or email.
That did not send. Please try again, or call +44(0) 1932 247 365.