Racking in our Fleet warehouse, stacked with flight cases.

Secure warehousing for IT equipment

Kit coming into our Fleet warehouse in Hampshire is booked in on our warehouse management system. Secure warehousing for IT equipment here means 600 racked pallet spaces, 100 floor spaces and a caged pre-staging area with two 42U racks. In June 2026 we pre-staged 50+ switches over several days. We serve Heathrow, West London and the South East.

What we do in the warehouse

Other jobs we do here: de-boxing and recycling the packaging, re-boxing, custom packing, a build area with prep tables, proof of concept lab racks, and a space for training your engineers on kit.

How storage and pre-staging run

Flight cases stacked and labelled in the warehouse, ready for the job.
  1. You tell us what's coming, how much of it and for how long.
  2. The kit arrives in our vehicle or yours and is booked in on the warehouse management system. Your team can see what's here and where.
  3. It sits in racked pallet spaces, or on the floor if it's big. Anything that needs building goes to the caged pre-staging area.
  4. In the cage there are two 42U racks, power, monitored PDUs and connectivity. We rack, cable, power up and test, and send you the result.
  5. When it's ready, we pick the order from the system and deliver, with our own drivers. We can install it on site too.

It's the same crew from storage to delivery. That's the point of keeping the warehouse, the vehicles and the people under one roof.

What we've stored and built here

  • July 2024four large chassis booked into the warehouse management system, with the client able to see them on the portal.
  • February 2026a Saturday emergency call-out. A switch was picked from the warehouse within an hour and swapped at the data centre by 10.15.
  • June 202616 racks to be consolidated here, pre-staged, then delivered and installed at sites including offshore.
  • June 2026firewalls in one pre-staging rack and 50+ switches and wireless access points through the other, over several days.

The warehouse in detail

AddressUnit 4 Quantum Business Park, Beacon Hill Road, Church Crookham, Fleet GU52 8EA (near Farnborough Airport)
Size6,500 sq ft including offices
Capacity600 racked pallet spaces and 100 floor spaces
Pre-staging cageCaged area with two 42U racks, power, monitored PDUs and connectivity
Power and networkThree phase 16A and 32A, full fibre
SecurityMonitored alarm and monitored CCTV, with a caged pre-staging area
Stock controlWarehouse management system. Orders are generated and emailed. A client portal shows what's in stock.
CoverArranged for each job to the value of your equipment, up to £0.5m without referral. Public liability no less than £2 million
StandardsISO 9001:2015 certified. Road Haulage Association member. See accreditations

Free pre-staging and rack test checklist

Most pre-staging goes wrong in the detail: a missing licence, a wrong cable, a config nobody saved. This is a checklist for the build, the power-up and the sign-off. PDF, no form.

Who we serve from Fleet

Our warehouse is the one address, in Church Crookham, Fleet, Hampshire. Heathrow data centres, West London, London, Farnborough and the South East are served from it.

A wide view of the racking in our Fleet warehouse.

Storage and warehousing questions

There isn't a standard price. It depends on how many pallet spaces or how much floor you need, for how long, how often things go in and out, and whether we're building or testing kit while it's here. Send us the list and the dates and we'll quote.

Storage is somewhere to keep things. Warehousing is keeping them, booking them in and out, and doing something with them while they're here. We do both, so you can have a pallet sit with us or a rack built and tested.

Both. Clients store kit here, call it off in batches and pre-stage what they need for each project.

It's building, cabling, powering up and testing kit in our caged area before it goes to site, so your engineers arrive to something that works. See IT pre-staging and rack and stack.

It has a monitored alarm and monitored CCTV, and the pre-staging area is caged. Kit is booked in and out on the warehouse management system, so you can see what's here.

We've done it. On a Saturday in February 2026 we picked a switch from the warehouse within an hour of the call and it was swapped at the data centre by 10.15. Ring the 24/7 line on +44(0) 7734 247 365.

Mostly electronic equipment: servers, network kit, racks, chassis, PCs, screens and the packaging that goes with them. If you're not sure it's suitable, ask.

We arrange cover for each job to the value of your equipment, up to £0.5m without referral, and can arrange more for higher-value loads. Warehouse keepers liability applies too. Public liability is no less than £2 million.

Yes. Our warehouse is in Church Crookham, Fleet, Hampshire, near Farnborough Airport. We serve Heathrow, West London, London and the South East from there with our own drivers.

Related services

Get a quote for storage or pre-staging

Tell us what's coming, how long it's staying and what needs doing to it, and we'll come back with questions or a quote.

We work from Church Crookham, Fleet, Hampshire, and serve Heathrow, West London and the South East from there.

We reply to every enquiry. Your details are used only to answer it. Privacy notice

Thank you, your enquiry has been sent

We have your details. Someone from the team will read it and come back to you by phone or email.

We reply to every enquiry. Your details are used only to answer it. Privacy notice

Thank you, your enquiry has been sent

We have your details. Someone from the team will read it and come back to you by phone or email.

CallGet a quote