
Services
Three 42u pre-staging racks at Farnborough and a 24u at Heathrow, with power, full fibre connectivity and build tables. Kit leaves us racked, configured and tested, not still in the box.
Site time is the expensive time. Anything we can do in the warehouse first, we do, so we unbox and recycle the packaging, rack the hardware, power it up, load firmware and images, cable it to your spec and test it. POC lab racks and full size computer rack pre-staging are both possible, and clients regularly come and sit with their kit at the Farnborough hot desk while it is built, which saves a lot of email. Then it goes out on our own vehicles, on your date.

We have our own customs agent in house, which is unusual for a company our size and saves a great deal of grief. Once you have signed a power of attorney we can raise the entries, the ATA Carnets and the T1 transit documents. Be clear about what a T1 means on the day: we collect the document from the customs office at the point of departure, drive to the customs office at the destination and present the goods there, and that can take an hour or it can take the whole day. The offices do not help either. They shut at 4pm most days, and all weekend. If you have a business entity in France, goods can be pre cleared there under an EU VAT regime and delivered onward anywhere in the EU, which is usually the smoother route.
Yes. Goods in are booked onto our warehouse management system, scanned by barcode or RFID and photographed, and every movement afterwards sits against that serial number, so when somebody asks in March what happened to a particular chassis there is a record rather than a memory. Orders can be generated automatically from the system and come to you by email. When the kit ships it goes on our own vehicles under tamper evident seals, the numbers logged against the asset list, tracked down to street level anywhere in Europe, and signed for. Both warehouses are alarmed to an NSI Gold alarm receiving centre with police response and covered by monitored CCTV.
It means the work that would otherwise eat your site window gets done at a bench first, with power and connectivity, where a fault costs an hour instead of a night. We have three 42u racks with power and connectivity at Church Crookham and a 24u rack at Hayes, three phase power distributed to 16 and 32 amp 240 volt outlets, and build areas with prep tables at both sites. Kit is unboxed, racked, powered up, configured, tested, labelled and photographed, then repacked and released on the date you want it. Anything dead on arrival is found here rather than at two in the morning in a data centre hall. That is the whole point.
Send site addresses and an approximate asset list. We will return a secure plan and confirmed date.
