A lab instrument being positioned on skates in the lab.

Laboratory relocation and lab equipment transport

Freezers, incubators, safety cabinets, analysers and the delicate instruments that sit beside them each need handling differently. Laboratory relocation, for us, runs from survey to handover: our own crews write the RAMS, move the equipment and place it in the room you choose. We work from Church Crookham, Fleet, Hampshire, and cover London.

What a lab move covers

Included

  • A survey of the route, lifts, doors and the receiving room, and RAMS written to match.
  • Collection and careful packing with blankets, straps, our own materials or flight cases.
  • Transport in GPS tracked vehicles with air suspension and tail lifts.
  • Delivery to the room of choice, with unpacking and the packaging taken away.
  • Stair climbers, Innolift electric stackers and an electric pallet truck for awkward routes.
  • Storage in our Fleet warehouse if the new lab is not ready (6,500 sq ft including offices, 600 racked pallet spaces and 100 floor spaces).

Not included, unless scoped in writing

  • Calibration, commissioning and validation, which stay with the manufacturer or your own team.
  • Decontamination of equipment. Where a site needs a certificate we ask for it before we collect.
  • Disconnecting and reconnecting fume cupboards and cabinets to services. A specialist does that and we work alongside them.
  • Moving samples and reagents. Who handles them is agreed at survey.
A lab instrument on its trolley, ready to move.

How to plan a laboratory move, stage by stage

A laboratory move runs in six stages. Work through them in order and put a date and an owner against each one.

What do we agree first? (scope and survey)

What is moving, what is being disposed of and what stays behind, with an asset ID and serial number for each item. Name the move owner and the lab lead, and flag anything that must stay cold, powered or upright in transit. Survey the doors, corridors, lifts, loading bay and floor loading at both ends.

What needs approving before anything is touched? (planning and approvals)

The method, the RAMS, building approvals and out-of-hours access. Brief the supplier and name any specialist who has to disconnect or recommission an item.

What has to happen before move day? (preparation)

Decontamination, emptying, labelling and power-down. Decontamination certificates are asked for before we collect.

What happens on move day?

The crew signs in, protects the route, packs and moves equipment in the agreed order and unloads at the other end. Nothing is left unattended, and photographs go in the record before and after.

What happens on arrival? (placement and reconnection)

Equipment is placed in the new lab upright, level and clear of walkways. A specialist reconnects services and makes it ready for use, and we work alongside them.

What is handed over at the end?

Records, certificates and sign-off pass to your team. Calibration and validation belong to whoever owns them.

Kit and standards

ISO 9001:2015 certified, Road Haulage Association member, DBS checked crews. Euro 6, GPS tracked, plain and unmarked vehicles with air suspension, tail lifts and 2.5 m load clearance.

Cover is arranged per job to the value of your equipment, up to £0.5m without referral. Public liability no less than £2 million.

A lab instrument on its trolley, ready to move.

Recent laboratory jobs

A lab doorway with the door and frame taken out so the instrument could pass.

Laboratory equipment movers and a £250k instrument that needed the door off

Sometimes laboratory equipment movers have to take a door off. In June 2024 we delivered and installed a £250k scientific device, and the site survey showed the door and frame had to come out, because there was next to no room to spare. We kept the device horizontal and bridged the steps with lite deck staging.

Read the case study
  • March 2025a job in Cambridge using an EP F-4 electric pallet truck and an Innolift.
  • June 2021a £400k cell analysis system moved by two of the team for a university.
  • August 2020a heat chamber moved for a laboratory client.

Laboratory Relocation Checklist and Timeline

Download the Laboratory Relocation Checklist and Timeline. A six-stage plan from survey to handover, covering fume cupboards, ultra-low temperature freezers, incubators and safety cabinets, decontamination certificates, route protection and condition photographs. Free PDF, no form.

Survey the route and the receiving room first. Keep the instrument upright and level, in original packaging or flight cases, on air suspension transport, with one team attending it from collection to the room. Photograph it before and after, and leave calibration to whoever owns it.

Yes. We move the units themselves with the right kit. Disconnecting and reconnecting services is done by a specialist and we work alongside them.

Yes. We are based at Church Crookham, Fleet, Hampshire, and serve London, Heathrow and West London. Our London lab moves start with the same survey as anywhere else.

We move the equipment: collection, transport, placement and storage. Validation and GxP stay with you or the manufacturer.

The equipment owner, with the manufacturer or a calibration specialist. We deliver the instrument to the room and leave a record of its condition.

We are a specialist transport team that moves labs among other high-value equipment. Lab equipment transport is routine for us, and we say at survey what we will and will not do.

Related services

We reply to every enquiry. Your details are used only to answer it. Privacy notice

Thank you, your enquiry has been sent

We have your details. Someone from the team will read it and come back to you by phone or email.

CallGet a quote