Servers moved, racked and tested inside the window you give us. We have been doing server relocation since 1996 with our own crews and our own vehicles.
A data centre migration is mostly planning and labelling, and then a long night. We audit the assets and capture serials, produce rack elevations and a patching schedule, label every cable and every unit before anything is unplugged, then de-rack, pack into shock mount cases, transport, rack and stack to the elevation and test. Nothing goes back in unlabelled. We work DC to DC, server room consolidations and office to colocation moves, in the UK and across Europe by road, and globally by airfreight when the timescale demands it.

Yes, and regularly. A fully populated 24u router can come out of a rack in London, travel in one of our 19 inch shock mount flight cases and go back in somewhere in Europe without a mark on it, and honestly the transport is the easy half. The awkward half is paperwork and access. A T1 has to be collected at the departure customs office and presented at the destination, which takes an hour or the whole day; the port pass needs a goods movement reference, which needs correct entries and a correct commercial invoice; and data centre access lists want names days in advance. Our crews are DBS checked and security vetted. We hold a Standard International Goods Vehicle Operators Licence with four Community licences, and our customs agent is in house. Plan the window generously.
Before the job you get the RAMS, our insurance schedule and whatever else your security team needs in order to sign us in. Goods in transit is £2,600 per vehicle all risks with AXA, public liability is no less than £2 million, and marine cargo can be quoted up to £0.5m without a referral to underwriters, although it will not cover a disk that was going to fail anyway. Nothing is subcontracted. During the move serials are scanned, cases are closed with tamper evident seals and the numbers logged against the asset list, and the vehicle is tracked to street level. Afterwards you get photographs, a signed proof of delivery and the serial list reconciled against your inventory. We hold ISO 9001:2015 and work aligned to ISO 27001.
Honestly, how much downtime you take is mostly a function of how your applications are built, not of how fast we drive. What we control is everything either side of the journey: the asset audit and serial capture, the rack elevations, the cable trace and patching schedule, labelling every cable and every port before a single thing is unplugged, and having the lifting kit on site so a 400kg chassis goes back into the rack in minutes rather than being wrestled. Pre-staging takes more off the night. We work the window you give us, usually overnight or at a weekend, and we would rather agree a realistic one with you than a heroic one.
Send site addresses and an approximate asset list. We will return a secure plan and confirmed date.