Our 18t truck inside an exhibition hall on the night load-out.

Exhibition transport for office pods, from a night load-out to a London install

Exhibition transport is two jobs with a hard deadline between them: getting the stand in, and getting it out. For an office-pod manufacturer in November 2024, we packed down three meeting rooms and two phone booths at an exhibition centre in one night, then handled the delivery, installation and return logistics.

Client type
An office-pod manufacturer
Scope
Exhibition load-out, delivery, installation and reverse logistics of meeting pods and phone booths
When
November 2024
Where
London, England
Results
Three meeting rooms and two phone booths packed down by a team of seven

The challenge

Office pods are not flat-pack shelves. A meeting room pod is a large, finished product that has to come apart cleanly and go back together the same way. A phone booth is smaller, but it is still a tall, awkward shape that does not forgive a rushed lift.

At an exhibition the problem gets sharper. The show closes, the hall empties, and the organiser gives every exhibitor a short load-out window.

The manufacturer had three meeting rooms and two phone booths on the floor. All of it had to come down, be packed so it would survive the trip and leave the building that night.

Then there was the other half of the job. Pods that go to a show do not stay there, so delivery, installation and reverse logistics follow.

Our approach

We sent a team of seven to the exhibition centre for the load-out. Three meeting rooms and two phone booths were packed down and loaded onto the truck.

Loading order matters on a job like this, because it decides what comes off the truck first at the other end.

For the install side, we handled a single-person phone booth pod and a larger four-person meeting pod. Both involved delivery, installation and then the reverse logistics.

For any show, we plan the load-out window with the organiser and venue first, because their rules decide when vehicles can enter.

The result

The three meeting rooms and two phone booths were packed down and loaded out by the team of seven. The pods then went through delivery and installation, and we took the reverse logistics off the client's hands.

It covers getting your stand, product and display kit to the venue for the build, and getting it all out again after the show. That can include dismantling, packing, loading in the right order, delivery and installation elsewhere. We agree the load-in and load-out windows with you and the venue first.

Because the window is short and the kit is bulky. At this job a team of seven packed down three meeting rooms and two phone booths in one night. With that many of us, every pod gets lifted and wrapped properly and the hall is clear before the venue's deadline.

Yes. We can pack down at the venue, move the kit and install at the next site, then handle the reverse logistics. Tell us the destination and any lift or access limits, and we will plan the crew around them.

Related case studies

See all case studies

Services used

Similar project?

Send us the show dates, the load-out window and what is on the stand, and we will plan the crew and the loading order.

We reply to every enquiry. Your details are used only to answer it. Privacy notice

Thank you, your enquiry has been sent

We have your details. Someone from the team will read it and come back to you by phone or email.

CallGet a quote