A wrapped medical device on our stair climber.

£600k medical devices taken down four flights of steps

In April 2024 a team of five from Secure Transportation made a white glove final mile delivery of three medical devices worth £600k. The devices had to stay horizontal and go down four flights of steps. We surveyed the site, wrote the plans and RAMS first, then used staging and an electric stacker.

Client type
Scope
Final mile white glove delivery of 3 medical devices, with site surveys, plans and RAMS
When
April 2024
Where
Results
3 devices worth £600k delivered, kept horizontal down 4 flights of steps, by a team of 5

The challenge

Three devices, worth £600k between them, and one rule: keep them horizontal. The route to the room included four flights of steps, which is where most of the risk sat.

A lift would have made it simple. Steps don't. Every turn, landing and handrail matters when the load can't be tilted.

Our approach

Five of our team did the delivery. Before the day, we carried out site surveys and wrote the plans and RAMS, so the route was known and agreed.

On the day we used lite deck staging rated at 750kg and an Innolift electric stacker rated at 600kg. The devices stayed horizontal for the whole of the move down the four flights.

Here is how we normally run a final mile delivery to the room of choice:

  • The route is inspected and protected before anything moves.
  • Everyone signs in on arrival, and wears PPE and follows infection control where the site requires it.
  • The equipment is placed where the client wants it.
  • Packaging is removed and taken away.
  • The client signs off.

For going up steps rather than down, we also use powered stair climbers.

The result

Three medical devices worth £600k delivered by a team of 5, kept horizontal down 4 flights of steps.

A survey shows the stairs, doors, turns and floor loading before we commit. It lets us choose the staging and lifting kit and write the RAMS to match. Without it, you find out about a narrow landing with the device already on the stairs.

It depends on the weight and the stairs. On this job we used lite deck staging rated at 750kg and an Innolift electric stacker rated at 600kg. Send us the weights and the route photos and we'll recommend the kit.

Yes, when you want it. On a room of choice delivery we place the equipment, take the packaging away and ask you to sign off. Tell us if the packaging needs to stay for a later move, and we'll leave it.

Related case studies

See all case studies

Services used

Got equipment that has to stay level on awkward stairs?

Send us the route photos and the weights, and we'll come back with questions.

We reply to every enquiry. Your details are used only to answer it. Privacy notice

Thank you, your enquiry has been sent

We have your details. Someone from the team will read it and come back to you by phone or email.

CallGet a quote