Ten racks, 400U, relocated inside 24 hours

In June 2024 we relocated 10 racks, 400U of equipment in all, inside a 24 hour window. The kit was shut down in phases, de-cabled and de-racked, then packed into flight cases ready for our trucks the next morning. This is how a window that tight shapes the job.

Client type
An organisation moving its own racks
Scope
Phased shutdown, de-cabling, de-racking, flight case packing and transport of 10 racks
When
June 2024
Where
Results
10 racks, 400U in all, relocated inside a 24 hour window

The challenge

A weekend, a shutdown and a clock. Ten racks, 400U of equipment, and 24 hours to get it all decommissioned, packed and moved.

Windows like this are normal on rack moves. A building or a service owner gives you a few hours, and anything that overruns eats into the next slot. So the job gets planned backwards from the moment the trucks need to leave.

The friction is usually in the middle. De-racking is quick when the cabling is labelled and slow when it isn't.

Packing is quick when the cases are already in the corridor and slow when someone is hunting for them. On a 24 hour job, those small delays are the ones that decide whether the trucks leave on time.

Our approach

The job started on a Friday. Flight cases were lined up in the corridor, ready for the de-rack and pack. Some of our team were there for a phased shutdown of the 400U, which means the racks came down in stages rather than all at once.

Each rack was de-cabled, then de-racked, then packed into flight cases. Our trucks arrived the next morning to take the cases away.

Here's how we set up any job with a window this short:

  • We ask for the rack list early and check it against what's in the racks.
  • We trace and label the cabling and photograph each rack before anything comes out.
  • We agree the shutdown order with you, so the kit that has to stay up longest is the last to come down.
  • We write the RAMS for the building and arrange cover for the value of the kit.
  • We book the trucks for a fixed time, so the cases don't sit in a corridor waiting.

The result

Ten racks, 400U in all, decommissioned, de-racked, packed and relocated inside the 24 hour window.

It depends on access, the power-down window and how full each rack is. This job ran inside 24 hours, with a phased shutdown on the Friday and the trucks arriving the next morning. Send us the rack list and the window you've got, and we'll tell you how many people it needs.

Kit comes out of the rack and goes straight into a case, so it isn't loose on a pallet or stacked in a corridor. Our anti-static lined cases and shock mount cases are built for servers, switches and routers, and they load straight onto the truck.

Your rack list, the access details for both ends and the window you've got. If we don't know the building, a walk-through video and photos of the rack elevations are the quickest way for us to see it. We'll come back with questions.

Related case studies

See all case studies

Services used

Similar project?

Send us your rack list and the window you've got, and we'll come back with questions.

We reply to every enquiry. Your details are used only to answer it. Privacy notice

Thank you, your enquiry has been sent

We have your details. Someone from the team will read it and come back to you by phone or email.

CallGet a quote