For a London recording facility, we relocated and re-installed 12 racks of outboard gear, large-format console sections, and monitoring through tight stair access using stair-climbers and floor protection. All equipment was case-packed, labelled, and calibrated to the client’s layout, with cable looms rebuilt and tested. Outcome: zero damage, first-session ready by Monday, and a tidy handover with photo documentation.